{"id":51,"date":"2024-04-27T11:44:07","date_gmt":"2024-04-27T11:44:07","guid":{"rendered":"https:\/\/biomaterialkit.ismat.pt\/?page_id=51"},"modified":"2024-12-03T17:26:59","modified_gmt":"2024-12-03T17:26:59","slug":"meetings","status":"publish","type":"page","link":"https:\/\/biomaterialkit.ismat.pt\/?page_id=51","title":{"rendered":"MEETINGS"},"content":{"rendered":"\n<div style=\"height:40px\" aria-hidden=\"true\" class=\"wp-block-spacer\"><\/div>\n\n\n\n<p class=\"has-zeever-secondary-color has-text-color has-link-color has-large-font-size wp-elements-97cfc551a92ae6fb4ea8c9909a97f04b wp-block-paragraph\" style=\"margin-right:var(--wp--preset--spacing--30);margin-left:var(--wp--preset--spacing--30)\"><strong>Project preparation and discussions meetings held<\/strong><\/p>\n\n\n\n<p class=\"has-normal-font-size wp-block-paragraph\" style=\"margin-right:var(--wp--preset--spacing--60);margin-left:var(--wp--preset--spacing--60)\">The implementation of the BiomaterialKIT project involves holding two monthly meetings via the ZOOM platform, where partners prepare and debate the preparation and results of the project&#8217;s actions and activities. It is through these work meetings that the results collected from the implementation are debated and harmonized according to the perspectives of the four BiomaterialsKIT partners.<br>In terms of municipalities, operational and strategic issues are addressed, such as the debate on the sister cities protocol, the alignment of the Roadmap for the green transition, good practices, among others.<br>On the academic side, these meetings are used to harmonize participatory methodologies, methods and tools to be used in dynamics with students and their families, as well as discussing the results obtained in Bootcamps and Workshops and thus synthesizing the ideas that result. in the Biomaterials Manual, in the ideas for Mobile_LAB and in the ideas for community intervention.<\/p>\n\n\n\n<p class=\"has-zeever-secondary-color has-text-color has-link-color has-large-font-size wp-elements-c9638e0e0d8724445e0c736d2e643f12 wp-block-paragraph\" style=\"margin-right:var(--wp--preset--spacing--30);margin-left:var(--wp--preset--spacing--30)\"><strong>Zoom and Project team <\/strong>meetings<\/p>\n\n\n\n<p class=\"has-zeever-secondary-color has-text-color has-link-color has-normal-font-size wp-elements-95c0cffdcb9e434393aec33d85d3bf52 wp-block-paragraph\">Internal preparatory and project management Team meetings<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-1 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"163\" src=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.35.51-1-1.jpeg\" alt=\"\" class=\"wp-image-163\" srcset=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.35.51-1-1.jpeg 1024w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.35.51-1-1-300x225.jpeg 300w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.35.51-1-1-768x576.jpeg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Internal Meeting Turkish Team<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"164\" src=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.49.47-2-1-1024x768.jpeg\" alt=\"\" class=\"wp-image-164\" srcset=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.49.47-2-1-1024x768.jpeg 1024w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.49.47-2-1-300x225.jpeg 300w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.49.47-2-1-768x576.jpeg 768w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.49.47-2-1-1536x1152.jpeg 1536w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.49.47-2-1.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Internal Meeting Turkish team<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"768\" data-id=\"152\" src=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.41.09-1024x768.jpeg\" alt=\"\" class=\"wp-image-152\" srcset=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.41.09-1024x768.jpeg 1024w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.41.09-300x225.jpeg 300w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.41.09-768x576.jpeg 768w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.41.09-1536x1152.jpeg 1536w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/WhatsApp-Image-2024-01-23-at-23.41.09.jpeg 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Internal Meeting Portuguese team<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<p class=\"has-zeever-secondary-color has-text-color has-link-color has-normal-font-size wp-elements-75f1522294f76f7cda1661a539e9ee31 wp-block-paragraph\">Online project Team meetings<\/p>\n\n\n\n<figure class=\"wp-block-gallery has-nested-images columns-default is-cropped wp-block-gallery-2 is-layout-flex wp-block-gallery-is-layout-flex\">\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"1021\" data-id=\"233\" src=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/MEETINGS01-1024x1021.png\" alt=\"\" class=\"wp-image-233\" srcset=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/MEETINGS01-1024x1021.png 1024w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/MEETINGS01-300x300.png 300w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/MEETINGS01-150x150.png 150w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/MEETINGS01-768x766.png 768w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/MEETINGS01.png 1083w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Project Team Meeting Zoom<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"662\" data-id=\"155\" src=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/Captura-de-ecra-2023-10-19-as-13.03.19-1024x662.png\" alt=\"\" class=\"wp-image-155\" srcset=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/Captura-de-ecra-2023-10-19-as-13.03.19-1024x662.png 1024w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/Captura-de-ecra-2023-10-19-as-13.03.19-300x194.png 300w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/Captura-de-ecra-2023-10-19-as-13.03.19-768x496.png 768w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/Captura-de-ecra-2023-10-19-as-13.03.19-1536x993.png 1536w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/04\/Captura-de-ecra-2023-10-19-as-13.03.19-2048x1324.png 2048w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Project Team Meeting Zoom 02<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"598\" data-id=\"350\" src=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/12\/ZOOM-Meeting-1024x598.jpeg\" alt=\"\" class=\"wp-image-350\" srcset=\"https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/12\/ZOOM-Meeting-1024x598.jpeg 1024w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/12\/ZOOM-Meeting-300x175.jpeg 300w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/12\/ZOOM-Meeting-768x448.jpeg 768w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/12\/ZOOM-Meeting-1536x897.jpeg 1536w, https:\/\/biomaterialkit.ismat.pt\/wp-content\/uploads\/2024\/12\/ZOOM-Meeting.jpeg 1600w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption class=\"wp-element-caption\">Internal Team Meeting zoom 03<\/figcaption><\/figure>\n<\/figure>\n\n\n\n<p class=\"wp-block-paragraph\"><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project preparation and discussions meetings held The implementation of the BiomaterialKIT project involves holding two monthly meetings via the ZOOM platform, where partners prepare and debate the preparation and results of the project&#8217;s actions and activities. It is through these work meetings that the results collected from the implementation are debated and harmonized according to the perspectives of the four BiomaterialsKIT partners.In terms of municipalities, operational and strategic issues are addressed, such as the debate on the sister cities protocol, the alignment of the Roadmap for the green transition, good practices, among others.On the academic side, these meetings are used<\/p>\n","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-51","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/biomaterialkit.ismat.pt\/index.php?rest_route=\/wp\/v2\/pages\/51","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/biomaterialkit.ismat.pt\/index.php?rest_route=\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/biomaterialkit.ismat.pt\/index.php?rest_route=\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/biomaterialkit.ismat.pt\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/biomaterialkit.ismat.pt\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=51"}],"version-history":[{"count":5,"href":"https:\/\/biomaterialkit.ismat.pt\/index.php?rest_route=\/wp\/v2\/pages\/51\/revisions"}],"predecessor-version":[{"id":387,"href":"https:\/\/biomaterialkit.ismat.pt\/index.php?rest_route=\/wp\/v2\/pages\/51\/revisions\/387"}],"wp:attachment":[{"href":"https:\/\/biomaterialkit.ismat.pt\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=51"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}